[{"data":1,"prerenderedAt":263},["ShallowReactive",2],{"navigation_docs_en":3,"-en-roadmap":52,"-en-roadmap-surround":258},[4,14,32,42],{"title":5,"path":6,"stem":7,"children":8},"The essentials","/en/proposition","en/1.proposition/1.index",[9,10],{"title":5,"path":6,"stem":7},{"title":11,"path":12,"stem":13},"Your need, understood","/en/proposition/comprehension","en/1.proposition/2.comprehension",{"title":15,"path":16,"stem":17,"children":18},"Overview","/en/architecture","en/2.architecture/1.index",[19,20,24,28],{"title":15,"path":16,"stem":17},{"title":21,"path":22,"stem":23},"Technical choices","/en/architecture/stack","en/2.architecture/2.stack",{"title":25,"path":26,"stem":27},"Security & compliance","/en/architecture/securite","en/2.architecture/3.securite",{"title":29,"path":30,"stem":31},"The 19 modules","/en/architecture/modules","en/2.architecture/4.modules",{"title":33,"path":34,"stem":35,"children":36},"The 8-month plan","/en/roadmap","en/3.roadmap/1.index",[37,38],{"title":33,"path":34,"stem":35},{"title":39,"path":40,"stem":41},"The method","/en/roadmap/methodologie","en/3.roadmap/2.methodologie",{"title":43,"path":44,"stem":45,"children":46},"Vortex-Soft","/en/equipe","en/4.equipe/1.index",[47,48],{"title":43,"path":44,"stem":45},{"title":49,"path":50,"stem":51},"References — eCampus","/en/equipe/references","en/4.equipe/2.references",{"id":53,"title":33,"badge":54,"body":55,"category":54,"description":251,"extension":252,"links":54,"meta":253,"navigation":255,"path":34,"seo":256,"stem":35,"tags":54,"__hash__":257},"docs_en/en/3.roadmap/1.index.md",null,{"type":56,"value":57,"toc":246},"minimark",[58,67,70,73,212,224,229,236,239],[59,60,61,62,66],"p",{},"Goal: ",[63,64,65],"strong",{},"go-live at M+8"," — four months ahead of your roadmap horizon. Design stays one sprint ahead of development; three tracks advance in parallel, one per engineer.",[68,69],"erk-gantt",{},[59,71,72],{},"The seven phases and their acceptance milestones in detail:",[74,75,76,95],"table",{},[77,78,79],"thead",{},[80,81,82,86,89,92],"tr",{},[83,84,85],"th",{},"Phase",[83,87,88],{},"Content",[83,90,91],{},"Period",[83,93,94],{},"Milestone",[96,97,98,113,130,147,164,181,195],"tbody",{},[80,99,100,104,107,110],{},[101,102,103],"td",{},"0 — Framing",[101,105,106],{},"Workshops, mockups, design system, infrastructure",[101,108,109],{},"M1",[101,111,112],{},"Approved mockups",[80,114,115,118,121,124],{},[101,116,117],{},"1 — Foundation",[101,119,120],{},"2FA auth, 7 roles, projects, dashboard",[101,122,123],{},"M2–M3",[101,125,126,129],{},[63,127,128],{},"Demo 1",": you log into ERK+",[80,131,132,135,138,141],{},[101,133,134],{},"2 — Steering & transactions",[101,136,137],{},"Timeline, budget, finance, quotes, payments",[101,139,140],{},"M3–M4",[101,142,143,146],{},[63,144,145],{},"Demo 2",": end-to-end financial journey",[80,148,149,152,155,158],{},[101,150,151],{},"3 — Site & media",[101,153,154],{},"Site journal, materials, photos, videos, live camera",[101,156,157],{},"M3–M5",[101,159,160,163],{},[63,161,162],{},"Demo 3",": your site, live",[80,165,166,169,172,175],{},[101,167,168],{},"4 — Documents & communication",[101,170,171],{},"Vault, e-signature, messaging, notifications",[101,173,174],{},"M5–M6",[101,176,177,180],{},[63,178,179],{},"Demo 4",": a contract signed in the vault",[80,182,183,186,189,192],{},[101,184,185],{},"5 — Hardening",[101,187,188],{},"Reports, delivery, warranty; load & penetration tests",[101,190,191],{},"M6–M7",[101,193,194],{},"Audit reports delivered",[80,196,197,200,203,206],{},[101,198,199],{},"6 — Launch",[101,201,202],{},"Full acceptance, store publication, training",[101,204,205],{},"M7–M8",[101,207,208,211],{},[63,209,210],{},"Production"," 🚀",[213,214,215,218,219,223],"tip",{},[63,216,217],{},"Why it is realistic."," Three full-time engineers, a scope we have already built elsewhere (see ",[220,221,222],"a",{"href":50},"our references","), and an automated test suite that verifies every requirement on every code change.",[225,226,228],"h2",{"id":227},"beyond-v1","Beyond V1",[59,230,231,232,235],{},"Your roadmap does not stop at launch. The V1 we deliver is ",[63,233,234],{},"the foundation of the next two versions"," — and we design it accordingly from day one.",[237,238],"erk-roadmap-horizon",{},[59,240,241,242,245],{},"V1 is our only contractual scope here. But every module boundary, every line of the payment ledger is drawn knowing what comes next. That is the difference between a V1 you throw away to build V2, and a V1 that V2 ",[63,243,244],{},"rests on",".",{"title":247,"searchDepth":248,"depth":248,"links":249},"",2,[250],{"id":227,"depth":248,"text":228},"Seven phases, three parallel tracks, production at M+8.","md",{"icon":254},"lucide:calendar-range",true,{"title":33,"description":251},"EeLjbS35on218xMi7Ih6yVVYmnSB3LwjW2Lyq4XuwxM",[259,261],{"title":29,"path":30,"stem":31,"description":260,"children":-1},"Full coverage of the specification, family by family.",{"title":39,"path":40,"stem":41,"description":262,"children":-1},"Two-week sprints, systematic demos, continuous acceptance.",1784147240095]