[{"data":1,"prerenderedAt":263},["ShallowReactive",2],{"navigation_docs_fr":3,"-fr-roadmap":52,"-fr-roadmap-surround":258},[4,14,32,42],{"title":5,"path":6,"stem":7,"children":8},"L'essentiel","/fr/proposition","fr/1.proposition/1.index",[9,10],{"title":5,"path":6,"stem":7},{"title":11,"path":12,"stem":13},"Votre besoin, compris","/fr/proposition/comprehension","fr/1.proposition/2.comprehension",{"title":15,"path":16,"stem":17,"children":18},"Vue d'ensemble","/fr/architecture","fr/2.architecture/1.index",[19,20,24,28],{"title":15,"path":16,"stem":17},{"title":21,"path":22,"stem":23},"Les choix techniques","/fr/architecture/stack","fr/2.architecture/2.stack",{"title":25,"path":26,"stem":27},"Sécurité & conformité","/fr/architecture/securite","fr/2.architecture/3.securite",{"title":29,"path":30,"stem":31},"Les 19 modules","/fr/architecture/modules","fr/2.architecture/4.modules",{"title":33,"path":34,"stem":35,"children":36},"Le planning 8 mois","/fr/roadmap","fr/3.roadmap/1.index",[37,38],{"title":33,"path":34,"stem":35},{"title":39,"path":40,"stem":41},"La méthode","/fr/roadmap/methodologie","fr/3.roadmap/2.methodologie",{"title":43,"path":44,"stem":45,"children":46},"Vortex-Soft","/fr/equipe","fr/4.equipe/1.index",[47,48],{"title":43,"path":44,"stem":45},{"title":49,"path":50,"stem":51},"Références — eCampus","/fr/equipe/references","fr/4.equipe/2.references",{"id":53,"title":33,"badge":54,"body":55,"category":54,"description":251,"extension":252,"links":54,"meta":253,"navigation":255,"path":34,"seo":256,"stem":35,"tags":54,"__hash__":257},"docs_fr/fr/3.roadmap/1.index.md",null,{"type":56,"value":57,"toc":246},"minimark",[58,67,70,73,212,224,229,236,239],[59,60,61,62,66],"p",{},"Objectif : ",[63,64,65],"strong",{},"mise en production à M+8"," — quatre mois d'avance sur l'horizon de votre feuille de route. Le design garde une longueur d'avance d'un sprint sur le développement ; trois pistes avancent en parallèle, une par ingénieur.",[68,69],"erk-gantt",{},[59,71,72],{},"Le détail des sept phases et de leurs jalons de recette :",[74,75,76,95],"table",{},[77,78,79],"thead",{},[80,81,82,86,89,92],"tr",{},[83,84,85],"th",{},"Phase",[83,87,88],{},"Contenu",[83,90,91],{},"Période",[83,93,94],{},"Jalon",[96,97,98,113,130,147,164,181,195],"tbody",{},[80,99,100,104,107,110],{},[101,102,103],"td",{},"0 — Cadrage",[101,105,106],{},"Ateliers avec vos équipes, maquettes, design system, infrastructure",[101,108,109],{},"M1",[101,111,112],{},"Maquettes validées",[80,114,115,118,121,124],{},[101,116,117],{},"1 — Socle",[101,119,120],{},"Authentification 2FA, 7 rôles, projets, tableau de bord",[101,122,123],{},"M2–M3",[101,125,126,129],{},[63,127,128],{},"Démo 1"," : vous vous connectez à ERK+",[80,131,132,135,138,141],{},[101,133,134],{},"2 — Pilotage & transactions",[101,136,137],{},"Chronologie, budget, suivi financier, devis, paiement",[101,139,140],{},"M3–M4",[101,142,143,146],{},[63,144,145],{},"Démo 2"," : parcours financier de bout en bout",[80,148,149,152,155,158],{},[101,150,151],{},"3 — Chantier & médias",[101,153,154],{},"Journal de chantier, matériaux, photos, vidéos, caméra live",[101,156,157],{},"M3–M5",[101,159,160,163],{},[63,161,162],{},"Démo 3"," : votre chantier en direct",[80,165,166,169,172,175],{},[101,167,168],{},"4 — Documents & communication",[101,170,171],{},"Coffre-fort, e-signature, messagerie, notifications",[101,173,174],{},"M5–M6",[101,176,177,180],{},[63,178,179],{},"Démo 4"," : un contrat signé dans le coffre-fort",[80,182,183,186,189,192],{},[101,184,185],{},"5 — Durcissement",[101,187,188],{},"Rapports, livraison, garantie ; tests de charge et d'intrusion",[101,190,191],{},"M6–M7",[101,193,194],{},"Rapports d'audit remis",[80,196,197,200,203,206],{},[101,198,199],{},"6 — Lancement",[101,201,202],{},"Recette des 3 parcours, publication stores, formation",[101,204,205],{},"M7–M8",[101,207,208,211],{},[63,209,210],{},"Mise en production"," 🚀",[213,214,215,218,219,223],"tip",{},[63,216,217],{},"Pourquoi c'est réaliste."," Trois ingénieurs à plein temps, un périmètre que nous avons déjà construit ailleurs (voir ",[220,221,222],"a",{"href":50},"nos références","), et une chaîne de tests automatisés qui vérifie chaque exigence à chaque changement de code.",[225,226,228],"h2",{"id":227},"au-delà-de-la-v1","Au-delà de la V1",[59,230,231,232,235],{},"Votre feuille de route ne s'arrête pas au lancement. La V1 que nous livrons est ",[63,233,234],{},"le socle des deux versions suivantes"," — et nous la concevons en conséquence dès le premier jour.",[237,238],"erk-roadmap-horizon",{},[59,240,241,242,245],{},"La V1 est notre unique périmètre contractuel ici. Mais chaque frontière de module, chaque ligne du registre de paiement est tracée en sachant ce qui vient après. C'est la différence entre une V1 que l'on jette pour faire la V2, et une V1 sur laquelle la V2 ",[63,243,244],{},"se pose",".",{"title":247,"searchDepth":248,"depth":248,"links":249},"",2,[250],{"id":227,"depth":248,"text":228},"Sept phases, trois pistes parallèles, mise en production à M+8.","md",{"icon":254},"lucide:calendar-range",true,{"title":33,"description":251},"Lnt2_TTo8-c0O28l1U8Y4ArfGRuYLUPIff1CqPTIjwQ",[259,261],{"title":29,"path":30,"stem":31,"description":260,"children":-1},"La couverture complète du cahier des charges, famille par famille.",{"title":39,"path":40,"stem":41,"description":262,"children":-1},"Sprints de deux semaines, démos systématiques, recette continue.",1784147240011]